First-time setup checklist for StypeKit
Section: Getting started
Applies to: StypeKit
Goal:
Confirm that all required steps are completed before operating StypeKit.
When you need this:
First installation
System was transported or rebuilt
Tracking or aiming does not behave correctly
Checklist:
Crane fully assembled and leveled
StypeKit console mounted and powered
Pan/tilt sensors connected
Headbox and motors connected
Lens data source selected
Pre-shooting setup completed
Virtual space defined
Profile saved or Full Recall created
Expected result:
System powers on with solid blue LEDs and responds correctly to joystick input.
Escalate to support if:
LEDs indicate missing components after checklist is complete
Labels:stypekit, getting_started, initial_setup
Comments
0 comments
Please sign in to leave a comment.